Overview
The study creation section outlines the step-by-step workflow for building a Traffic Stats analysis in iNode. The process includes choosing the right study type, defining your network, and refining the scope using vehicle types, date ranges, and time sets.
Before confirming, you’ll review a summary of your selections, including expected sample size and credit usage.
The following breaks down each step, guiding you in selecting the right options and configuring your study with clarity and confidence.
Study Overview
Study Overview
Draft Your Study
Draft Your Study
Date Range and Time Set
Date Range and Time Set
Confirm Your Study
Confirm Your Study